Gledswood Hills Building
Inspections

Masking tape on the handrail

The small thing that tells you about the big thing.

Owner Inspections · Gledswood Hills 2557 · 2026-08-26

In short: Balustrades unpainted and tape still attached at practical completion in Oran Park.

What was recorded

Balustrades not painted, twice, and masking tape still attached to them, twice, at a practical completion inspection in Oran Park.

Why it is worth writing down

On its own it is a trivial item. As evidence it says the painter was pulled off before finishing and nobody checked before the house was offered for handover.

What else to look at when you see it

Anywhere else that trade was working. Unfinished elements cluster, because they are usually one interrupted visit rather than a series of oversights.

The cost of leaving it

Painting a fitted balustrade after you move in means masking the stair, the wall and the floor. Before handover it is the painter's problem.

How it should be listed

By element and location, so the item is closed by inspection rather than by assurance.

Written by the Owner Inspections team from inspections carried out in Gledswood Hills. Licensed building practitioners, NSW Fair Trading licence 366177C.

Guides

More pci / handover guides for Gledswood Hills

All guides →

Book a building inspection in Gledswood Hills

Instant online pricing, or talk to the booking team on 1300 471 805.

FAQ

Questions Gledswood Hills owners ask about this

Is tape a defect?

Not in itself. It is evidence, and evidence is worth recording because it points at what else to look at.

Should I list every small thing?

List them, and then be pragmatic about which ones you press. A long list costs you nothing; conceding an envelope item does.

Do builders resent long lists?

Good ones do not. They would rather have a written list than a series of phone calls after settlement.

Do you reinspect?

Yes. It is a separate attendance, and every item is marked complete, part complete or outstanding.

CallGet a Free Quote